Facility scope

A facility review should cover the chain from utility and carrier infrastructure to the rack. A redundant device is not protected if the shared room, distribution panel or cooling system fails.

Useful evidence

  • Single-line power diagrams
  • Generator load-test records
  • Battery maintenance reports
  • Temperature and alarm history
  • Carrier route documentation
  • Emergency access and contact records